How KE Grid Dhabje Ensured Fire Safety with GreenTech Room Integrity Test

1 Critical Infrastructure

Room integrity test successfully conducted at KE Grid Dhabje, Karachi.

Full Testing Service

End-to-end assessment, simulation, and certification for system reliability.

Future-Ready

Ensuring compliance and readiness for fire suppression activation.

Room Integrity Test
K-Electric
Industry

Industry:

Power Generation, Transmission & Distribution

Headquarters

Headquarters:

Karachi, Pakistan

Company Size

Company Size:

Over 10,000 employees

Key Outcome

Key Outcome:

K-Electric faced challenges in ensuring the reliability and compliance of its fire suppression systems at the Dhabje Grid Station. Greentech Solutions resolved this issue by conducting a comprehensive room integrity test, verifying full compliance with international fire safety standards.

Executive Summary

KE Grid Dhabje, a key power infrastructure in Karachi, required a reliable room integrity test to validate its fire suppression system. GreenTech Solutions provided a complete testing service, ensuring the facility’s critical equipment remains protected during a fire event. The project reinforced GreenTech’s expertise in safeguarding mission-critical environments through advanced fire safety engineering.

Introduction

For facilities like power grids, operational continuity is critical. Fire suppression systems can only be effective if the protected rooms maintain airtight integrity. KE Grid Dhabje engaged GreenTech Solutions to perform a room integrity test for its fire suppression-protected areas, ensuring safety, compliance, and uninterrupted operations.

Challenge

The project presented several key challenges:

  • Ensuring air tightness to maintain suppression agent concentration.
  • Verifying compliance with NFPA and international safety standards.
  • Conducting the test without disrupting ongoing grid operations.
  • Providing accurate, data-driven results for certification.

Solution Implemented

GreenTech Solutions delivered a comprehensive approach:

  • Deployed specialized equipment to measure room leakage and pressure decay.
  • Simulated fire suppression release scenarios to validate retention times.
  • Documented all results in compliance with international codes.
  • Provided actionable recommendations for improving room sealing where required.

Results

The project outcomes included:

  • Verified System Reliability: Room integrity validated for fire suppression performance.
  • Regulatory Compliance: Testing aligned with NFPA standards and safety codes.
  • Operational Confidence: KE Grid assured of system readiness in case of emergency.
  • Data-Backed Certification: Complete reports provided for safety audits and inspections.

Client Satisfaction

KE Grid management expressed high satisfaction with GreenTech’s professional testing and reporting. The results assured compliance and provided confidence that the fire suppression system will perform effectively when needed.

Future Steps

GreenTech Solutions will continue to support KE Grid Dhabje with periodic re-testing, maintenance, and upgrades. Future improvements may include advanced sealing solutions and integration with smart monitoring systems for real-time safety assurance.

GreenTech Expertise

This project highlights GreenTech Solutions’ expertise in room integrity testing for critical facilities. By combining advanced testing methods with industry compliance, GreenTech ensures reliability, safety, and long-term operational protection for clients across Pakistan.